Project Description

Desh Energy Limited

100 MW Power Plant at Siddhirganj, Narayanganj

The Power Plant utilizes 96 units of Brand New Caterpillar G3512B diesel generator sets rated at 1200 ekW at 0.80 Plant Factor (Lagging) at 1500 RPM, 50HZ, 600V continuous services at site with a total generating capacity of 100.32 MW. The Plant was based on a 3 Years Power Purchase Agreement (PPA) with the Bangladesh Power Development Board (BPDB), which has recently been extended to another 5 years up to February 2019. The plant supplies power to BPDB’s 132 kV Grid in Dhaka.

  • Factory Specification: Factory floor space 45,000 sft.
  • Work Force: 700
  • Production capacity: 12 g 6,000 dz/month
  • Products: All Kind of Sweater, cardigan & pullover for Men/Ladies/Children
  • Minimum Order Quantity:  1,000 Dozen per style / 250 Dozen per Color
  • Lead Time: 60-90 Days after the approval of Lab-dip & Sample.
  • Number of machine: Knitting Machine: 124, Auto Knitting Machine: 104,Sewing: 55, Linking: 209,Other: 60
  • Year of Establishment: 2005

Image Gallery

Plant:
  • Siddhirganj, Narayanganj, Bangladesh
  • +880 9612 222000
  • Desh.Siddhirganj@deshenergy.com.bd
Head Office:
  • Lotus Kamal Tower – One 16th Floor, 57 Joar Sahara C/A., Nikunja-2, Dhaka 1229, Bangladesh
  • +8809612 222000
  • +880 2 48952704
  • info@deshenergy.com.bd